Key facts
| Site Location | The proposed wind cluster site is located within the landholding of Warwick Hall Farm to the north-west of Aspatria (circa 1 km) and to the south of Westnewton village circa 0.7 km) within Allerdale Borough Council, Cumbria. The wind cluster is centred on grid reference NY132429. |
| Site Area | View site layout map (pdf). For a view of the site in a wider context please click here to see the interactive map. |
| Number of turbines | 5 |
| Duration | 20 to 25 years excluding three years construction and decommissioning |
Information relating to the turbines, traffic, wind monitoring and grid connection can be accessed by clicking the links below: